The last thing to do before the cabinets
are installed is to remove the sink.
That is what AJ did Sunday evening.
Monday morning, April 19, the installer
will be here at 8:00 AM to start putting
my kitchen back together.
It is really getting hard to see the
light at the end of the tunnel,
when you are are is such a mess.
in the garage, in the living room and
sitting on any flat surface.
no cooking. The microwave is sitting
in the bedroom at the foot of the bed,
so no heating up food. The sink is
gone, so all water is gotten out of the
bathroom basin for coffee, drinking,
and washing up a cup or spoon.
If you look back at the pictures, you will see
the large orange buckets were in the kitchen,
now they are in the living room.
the installer gets here and starts to work.
First he takes the top cupboards,
that were in boxes all over the kitchen
and dinning area, out of the boxes and
puts them in the kitchen. The boxes are
broken down and put outside.
At last we can walk a straight line.
He starts hanging the top cabinets.
No sooner do we get use to the open space,
the bottom cabinets are delivered. We are
now worse off then we were.
Tuesday Josh is back again at 8:00 AM to
continue on the prodject. He gets most of it
done, but will be back Wednesday to finish up.
No comments:
Post a Comment